In January I set myself an optimistic 21 in 21 type of list, although I was completely aware that completing them all was nearly impossible. It seems a good time to have a review of my progress against the list.
The list:
1 Aran squares x 3 (WIP)
2 Xmas Stars (WIP)
3 Wedding quilt (WIP)
4 Jessa trousers
5 Grace 2/ Marguerite
6 Lovenote sweater (WIP)
7 Jonie
8 Xmas mini
9 Socks x 7 (WIP)
10 Jessa shorts
11 Snowflake quilt
12 Billie dress
13 Billie top
14 Hitofude
15 Bird quilt
16 Cross stitch bookmark (MIA)
17 Rainbow quilt (WIP)
18 Xmas Lucy's Terrace
19 Cat quilt
20 Jumping dots
21 Bag
So that's 3 items complete:
The Joni dress and the Jessa trousers are in different states of partial completion:
And I've completed two pairs of socks with another two on the needles:
Considering how weird life is still I think I've made pretty good progress and I couldn't resist making one or two things that weren on the list and there are more planned: